Skip to content
SL Tiling

Residential & commercial

Wet Area Waterproofing in Auckland

Membranes to AS/NZS 3740, with reinforced junctions and a photographic record of every stage.

The work

Waterproofing is the only part of a tiling job that is completely invisible on handover day and completely decisive ten years later. It is also the part most often rushed, because it sits between two trades and delays the one that follows.

One trade, falls through to membrane

The person who forms the falls is the person who membranes them. Waterproofing is not handed off to whoever is available that week, because the handover is where most wet-area failures start.

Junctions reinforced, not just coated

Wall-to-floor junctions, internal corners, hobs and every penetration take bandage reinforcement bedded into the membrane. Those junctions are where movement concentrates and where failures actually begin.

Photographed and documented

Each stage is photographed with the room and date recorded. When a building surveyor asks in year eight, the record exists.

Correct coats, correct cure

Two coats at the manufacturer's wet-film thickness with the full cure interval between them. Cure times are set by chemistry, not by programme, and we will not tile over a membrane that is not ready.

What the price covers

  • Substrate preparation, priming and moisture assessment
  • Screeds and falls formed to the waste outlet
  • Bond breakers at movement-prone junctions
  • Bandage reinforcement to corners, hobs and penetrations
  • Two-coat membrane at specified wet-film thickness
  • Flood testing where the design permits
  • Photographic record of every membrane stage

Standards applied

  • AS/NZS 3740
  • NZBC E3

We reply to every quote request within one working day.

Request a measured quote

What this work looks like

Operator preparing and cleaning a concrete slab before tiling
Crew trowelling and levelling a screed bed across a deck
Tiler mixing adhesive on a stripped floor during a renovation
Part-tiled wall with the next course set out and levelled

Questions

Waterproofing, answered

We reply to every quote request within one working day. If your question is not here, ask it on the quote form and you will get a written answer, not a sales call.

Ask your question

Start your project

Tell us the room. We will tell you the number

We reply to every quote request within one working day. Measured quotes are fixed and written, broken down by area, with tile allowances and movement joints itemised.