Skip to content
SL Tiling

Commercial sector

Aquatic centre and pool tiling

Tank linings, level-deck channels and barefoot-rated surrounds built to survive permanent immersion and pool chemistry.

Cure time
Programmed, never compressed
Works staged
Around facility shutdown windows
Falls and outlets
Surveyed before the first tile

The package

A pool is the least forgiving surface there is to tile. The lining is permanently immersed, chemically loaded and under hydrostatic pressure, and a failure is not a defect you patch on a Tuesday — it is a drained tank and a closed facility.

So the system matters more than the tile. A tank gets a fully bonded build-up: rendered and floated substrate, a tanking membrane suited to permanent immersion, a cementitious adhesive rated for it, and a chemical-resistant grout. Surrounds are specified barefoot-wet rated, and the level-deck channel is set out first because everything else takes its line from it.

A system rated for permanent immersion

Every layer from render to grout is selected as a compatible immersion-rated system from one manufacturer. Mixing brands across a tank build-up is how warranties are lost.

Cure time that cannot be compressed

Adhesive and grout in a tank need their full cure before filling. We build that into the programme honestly, because a tank filled early fails and the programme saved is repaid tenfold.

Barefoot-wet slip ratings on surrounds

Surrounds, ramps and changing-room floors are specified to a tested barefoot-wet rating with the certificate retained, and falls are set so water reaches the channel rather than sitting in the walkway.

Level-deck channels set out first

The channel is the datum for the whole pool hall. We set it out and confirm levels before any surround tiling begins, because a channel corrected afterwards means lifting everything around it.

Scope we carry

  • Pool tank linings in fully bonded, immersion-rated systems
  • Waterline bands, step markings and depth-marker tiling
  • Level-deck channel set-out, tiling and grating transitions
  • Barefoot-rated surrounds, ramps and wet-deck areas
  • Changing rooms, shower blocks and sauna surrounds
  • Render, float and fall correction to tank walls and floors
  • Chemical-resistant epoxy grouting where specified
  • Shutdown-window programming with staged handback

Compliance

  • NZS 4441Swimming pool design requirements for finishes and detailing.
  • AS/NZS 4586Barefoot-wet slip resistance classification for surrounds and ramps.
  • AS 3958.1Bedding, full adhesive coverage and movement joint placement.
  • NZBC E3Internal moisture control in pool halls and changing facilities.

On site

Swimming pool lined in blue mosaic with tiled entry steps
Blue pool tiles seen through clear water
Blue mosaic pool corner with a tiled waterline band
Geometric pool with a tiled surround and coping detail

For main contractors

Aquatic centres & pools tiling, answered

We reply to every quote request within one working day. If your question is not here, ask it on the quote form and you will get a written answer, not a sales call.

Ask your question

Start your project

Tell us the room. We will tell you the number

We reply to every quote request within one working day. Measured quotes are fixed and written, broken down by area, with tile allowances and movement joints itemised.