Ground-floor stone that carries the building's reputation, and amenity cores repeated identically up thirty levels.
- Set-out sheet
- One approved sheet, every level
- Book-matched stone
- Dry laid and approved before fixing
- Movement joints
- Placed on the structural grid
The package
An office tower has two tiling packages inside one contract. The ground-floor lobby is a stone job where the client will stand at the entry and look down the length of the floor. Everything above it is a repetition job: the same amenity core, the same end-of-trip facility, level after level, each one sequenced against the hoist.
Tower work lives or dies on logistics. Material has to arrive on the right level in the right sequence, because a pallet of stone on the wrong floor is a crane movement nobody budgeted. We plan deliveries around the hoist schedule, stage material with the main contractor, and keep the load within the slab limits the engineer has given us.
Lobby stone with no tolerance for lipping
Grazing light across a lobby floor exposes every high edge. We grind and level the slab to a measured flatness before a tile is opened, then set out so the pattern runs to the entry axis and the lift doors.
Repeated cores, identical every time
Amenity cores are built from a fixed set-out sheet issued after the control level is approved. The tiler on level 22 works to the same drawing as the tiler on level 3.
Hoist-scheduled deliveries
Material is booked to the hoist with the main contractor's logistics manager, staged on the level it is needed, and distributed within the slab loading limits set by the engineer.
Movement joints on the structural grid
Tall buildings move. Movement joints are set out on the structural grid and at every perimeter, not placed where they are least visible, because the joint is what stops the floor from tenting later.
Scope we carry
- Ground-floor lobby stone and large-format porcelain
- Lift lobbies, thresholds and entry transitions
- Repeated amenity cores and accessible bathrooms
- End-of-trip facilities, showers and changing rooms
- Substrate grinding, levelling and flatness verification
- Waterproofing to all wet areas with photographic records
- Movement joint design coordinated with the structural grid
- Level-by-level QA sign-off and consolidated handover documentation
Compliance
- AS 3958.1Installation, adhesive coverage and movement joint design.
- AS/NZS 3740Waterproofing of amenity and end-of-trip wet areas.
- AS/NZS 4586Slip resistance classification for lobbies and shower floors.
- NZS 4121Access and mobility requirements at thresholds and accessible bathrooms.
On site




Related sectors
For main contractors
Office & commercial towers tiling, answered
We reply to every quote request within one working day. If your question is not here, ask it on the quote form and you will get a written answer, not a sales call.
Ask your questionStart your project
Tell us the room. We will tell you the number
We reply to every quote request within one working day. Measured quotes are fixed and written, broken down by area, with tile allowances and movement joints itemised.