Hotel and hospitality tiling

Guest bathrooms repeated to the same set-out across every level, plus front-of-house stone that has to survive luggage trolleys.

Control sample
Signed off before production starts
Night and staged works
Available for live hotels
Handover
Room-by-room photographic QA

The package

Hotel work is two jobs on one site. Front of house is a stone job judged by an interior designer under lighting that shows every lipped edge. Back of house is a repetition job: the same guest bathroom, eighty or four hundred times, each one waterproofed, each one signed off, each one identical to the type unit the client approved.

Hospitality work should run off a control sample. One bathroom is built early, inspected by the main contractor, the designer and the client together, and that unit becomes the standard. Every subsequent room is measured against it rather than against opinion. Where a floor plate deviates, we raise it before the membrane goes down, not after the vanity lands.

Repetition without drift

The eightieth bathroom has to match the first. We fix the set-out, the niche height, the fall and the grout colour at control-sample stage and issue it as a one-page sheet that stays in the room until the tiler leaves it.

Trolley traffic in lobbies

Lobby stone fails at the entry threshold and at lift lobbies, where wheeled loads concentrate. We specify full adhesive coverage, check it by lifting tiles at random, and set movement joints on the structural grid rather than hiding them under a rug.

Live-site sequencing

Refurbishments run floor by floor while guests are in the building. We work to agreed noise windows, keep a hoarded and signed route from the goods lift, and clean down to a public-facing standard at the end of every shift.

Slip resistance where it is wet

Bathroom floors, pool surrounds and kitchen exits are specified to a tested slip rating and we keep the test certificate with the handover pack. A finish that looks right and slips is a claim waiting to happen.

Scope we carry

  • Control-sample guest bathroom, inspected and signed before production starts
  • Waterproof membrane to all wet areas, photographed room by room
  • Guest bathroom floors, walls, niches and shower screens set out from the sightline
  • Lobby, lift lobby and corridor stone including large-format porcelain
  • Bar fronts, restaurant splashbacks and feature mosaic
  • Pool surround and spa tiling where included in the contract
  • Back-of-house kitchen and service-area floors
  • Room-by-room QA sheets and a consolidated handover pack

Compliance

  • AS/NZS 3740Waterproofing of every guest bathroom and wet area.
  • AS 3958.1Adhesive coverage, bedding and movement joints.
  • AS/NZS 4586Slip resistance classification for wet-area and entry floors.
  • NZBC E3Internal moisture — falls, upstands and junctions.

On site

Hotel lobby seating area on a patterned stone floor
Hotel lounge with warm lighting over a large-format stone floor
Panel of white marble tiles with tight, aligned joints
Two site staff reviewing drawings on an open construction site

For main contractors

Hotel & hospitality tiling, answered

We reply to every quote request within one working day. If your question is not here, ask it on the quote form and you will get a written answer, not a sales call.

Ask your question

Start your project

Tell us the room. We will tell you the number

We reply to every quote request within one working day. Measured quotes are fixed and written, broken down by area, with tile allowances and movement joints itemised.