Skip to content
SL Tiling

About the company

Tilers first,contractors second

A small Auckland tiling outfit. The person who quotes your job is the person who sets it out, and the person who forms the falls is the person who membranes them.

Based
Auckland, New Zealand
Residential
Bathrooms, kitchens, floors
Commercial
Fit-outs and wet areas
Quotes
Fixed and written

How we work

The part you cannot see is the part that decides

Almost every failed shower fails underneath the tile — in the membrane, the falls or the junction detail — and almost none of it was ever photographed. By the time the smell reaches the hallway skirting, nobody can say what was under there or who put it there.

So the waterproofing does not get handed to whoever is free that week. The person who forms the falls is the person who membranes them, every stage is photographed with the room and the date recorded, and the record goes to you whether or not anybody ever asks for it.

The rest follows from the same idea. Dry lay before anything is fixed, so the cuts land where nobody looks. Adhesive coverage checked by lifting a tile at random rather than assuming. Movement joints where the standard puts them, not where they are easiest to hide.

Craftsmanship in motion

Ninety seconds of setting out, bedding and levelling

Large-format tile is unforgiving. A two-millimetre lip across a 1,200 mm edge catches the light down the whole wall, and no amount of grout hides it.

So we notch, back-butter, bed and clip every slab, then lift one at random to check the adhesive coverage behind it before the row is locked in.

It is slower on the day, and it is the reason a floor is still flat when the builder comes back four years later.

See our services

What we hold ourselves to

Four things that do not move

Set out before we stick anything down

Every job starts with a dry lay and a setting-out plan, so cuts land where nobody looks and full tiles land where everybody does.

The waterproofing is the job

Tiles are the part you see. The membrane underneath is the part that decides whether the room is still sound in fifteen years.

One crew, start to finish

The tiler who sets out your floor is the tiler who grouts it. No handover, no drift in standards halfway through.

Programme is a promise

We give main contractors a date we can hold, then we hold it. If something moves, you hear it from us first.

The standards the work is judged by

Not house rules — published standards

Anyone can say their work is good. These are the documents a building surveyor, a main contractor or an insurer will actually open, and they are what the work is set out and installed against.

AS/NZS 3740

Waterproofing of domestic wet areas

Every internal wet area is membraned to AS/NZS 3740 and photographed before screed and tile go down.

NZS 4442

Welded mesh for concrete reinforcement

Substrates and toppings are checked against the structural drawings before we accept a floor for tiling.

AS 3958.1

Installation of ceramic tiles

Bedding, adhesive coverage and movement joints follow the installation standard rather than habit.

NZBC E3

Internal moisture

Falls, upstands and junctions are set out to shed water to the outlet, not to the door.

Get a fixed written quote

Start your project

Tell us the room. We will tell you the number

We reply to every quote request within one working day. Measured quotes are fixed and written, broken down by area, with tile allowances and movement joints itemised.